Step 1: Unpack and inspect
1 of 9Screens must be installed squarely to ensure smooth operation.
- 1Remove the Distinction screens from the box. Separate the different metal profiles and the mesh cartridges.
- 2Keep the cartridges taped closed at this stage to ensure no strings get trapped in the working parts.
- 3Inspect the units for any damage before you begin and measure to ensure they are the correct size.